Projects

At 3M Structural Solution, we are proud to showcase our diverse portfolio of projects. Our work spans throughout various sectors, including commercial, residential, health and education. Each project is a testament to our commitment to excellence, sustainability, and cutting-edge engineering solutions. Explore our portfolio to see how we've helped bring visionary designs to life.

Project Gallery

3m structural solution -Residential Apartment Glen Waverly
Waverley Road, Glen Waverley
Project Type: Residential Apartment including 12 luxury apartments with 15 carpark spaces
4 Storey post tensioned concrete structure with single level basement. 3M Structural Solution was engaged to provide structure and civil consultancy and design.
Riversdale Road, Hawthorn
Project Type: Residential Apartment including 18 luxury apartments with 20 carpark spaces
4 Storey post tensioned concrete structure with double level basement. 3M Structural Solution is engaged to provide for structure, facade and civil consultancy and design.
Cape Street, Heidelberg
Project Type: Steel frame Residential Units including single level basement car park
Triple Storey steel and timber frame structure with single level basement. 3M Structural Solution was engaged to provide for structure and civil consultancy and design.
Malvern Road, Malvern East
Project Type: Steel frame Residential Units including single level basement car park
Triple Storey steel and timber frame structure with single level basement. 3M Structural Solution was engaged to provide structural and civil consultancy and design.
North Road, Ormond
Project Type: 18 Steel frame residential units including single level basement car park
Triple Storey steel and timber frame structure with single level basement. 3M Structural Solution provided structural engineering and construction stage services.
Doncaster Road, Doncaster
Project Type: Steel frame Side by Side Residential Units including single level basement car park
3M Structural Solution was enraged for structural engineering and construction stage services.
Mont Albert Road, Camberwell
Project Type: Residential double storey concrete structure over single level basement with retention wall design and swimming pool design
3M Structural Solution provided structural engineering, civil engineering and construction stage services.
Grange Road, Toorak
Project Type: Residential double storey concrete structure over single level basement with retention wall design and swimming pool design
3M Structural Solution was engaged for structural engineering, civil engineering and facade design.
Mont Albert North Mansion
Project type: Double storey dwelling with concrete waffle slab and Light Gauge Streel (LGS) framing
3m structural solution was engaged for structural engineering and construction inspection.
McRee Road, Vermont South
Project Type: 14 Triple Storey steel frame units, concrete raft slab foundation and retaining wall design
3M Structural Solution provided structural engineering, civil engineering and construction inspections.
Esdale Street, Doncaster
Project Type: Three double storey steel frame units, stiffened raft slab concrete footing and retaining wall design
3M Structural Solution provided for structural engineering, civil engineering and inspections.
Port Melbourne Townhouse
Project Type: 16x Three and Four-Storey Unit Development
Structural design involved light gauge steel framing and bracing.
Waverley Road, Glen Waverley
Project Type: Double storey post tensioned concrete Childcare structure with design for steel framed roof systems
3M Structural Solution provided structural engineering, civil engineering and value management consulting.
3m - saltlake
Salt Lake Boulevard, Wollert
Project Type: Single storey Childcare with significant Heritage protection overlay. Design with existing bluestone walls as part of heritage council requirements
3M Structural Solution provided structural engineering, civil engineering and value management consulting.
Dandenong Frankston Road, Dandenong Warehouse
Project Type: Structural design to steel frame portal beams, roof systems, retrofit and structural strengthening to existing steel columns
3M Structural Solution provided structural engineering and construction inspections.
PENTRIDGE RESTAURANT
PENTRIDGE RESTAURANT
Project Type: Commercial fit out and structural seismic design
3M Structural Solution was engaged to provide structural consultancy and fit out design.
DINGLEY PAVILLION
DINGLEY PAVILLION
Project Type: Commercial fit out and structural seismic design
3M Structural Solution was engaged to provide structural consultancy and fit out design.
GIPSLAND SPECIALIST SCHOOL
GIPPSLAND SPECIALIST SCHOOL
Project Type: School fit out and structural seismic design
3M Structural Solution was engaged to provide structural consultancy and fit out design.
CAPITAL GRAND
CAPITAL GRAND
Project Type: Commercial fit out and structural seismic design
3M Structural Solution was engaged to provide structural consultancy and fit out design.
Doncaster Road, Doncaster East
Project Type: 14 Units Residential Development
Ground floor drainage design including on-site detention system and in ground reuse rainwater tanks for reuse purpose. Site stormwater discharged was limited to pre-development flow rate using orifice/ baffle control pit prior to connection to legal point of discharge. Civil design included an 18m length outfall drain meeting the requirement of local council.
High Street Road, Glen Waverly
Project Type: 4 Level Residential Apartment On 2 Level Basement
Civil design involved ground floor stormwater drainage design and 2 level basements. Oversized pipes were used for on-site detention. Multi-Cell flow control system was used to control the site discharge flow rate meeting council requirement. Basement pumps were designed for 100 years flood event. Extensive coordination with all design consultants including architectural, structural, services and fire engineering were required prior to submission of civil design plan to local council.
Leura Street, Surry Hills
Project Type: Apartment Development Over Single Level Basement
Design involved internal drainage system design via an onsite detention system for 8 units over a single levels basement. Basement drainage was comprised of retention wall drainage, pump design and treatment system for basement retention wall system seepage.
Riversdale Road, Hawthorn
Project Type: 4 Level Apartment Over 2 Level Basement
Internal stormwater drainage design including on-site drainage
system. 2 level basement drainage involved capturing seepage from
retention piles and conveying to pump system detentions system.
The pump system was designed for 100-year storm event. On-site
detention volume was accommodated in an underground detention
tank connecting to an orifice pit prior to connection to legal point of
discharge. Civil design required extensive and ongoing coordination
with all design consultants including architectural, structural, and
service engineers.
Saltlake Blvd, Wollert
Project Type: Childcare Center Including 17 Carpark Spaces
Stormwater drainage design on a 2238sqm site including onsite
detention system. Civil design included flexible pavement design
and drainage design for car park and driveway areas. Avoiding
existing tree protection zones and existing heritage buildings onsite
required intricate design work.
Gelen weverly childcare - 3M
Waverley Road, Glen Waverley
Project Type: Two Level Childcare Center Including 32 Carpark Spaces
Stormwater drainage design across 3 lots including on-site detention system using oversized drainage pipes. Civil design included rigid pavement design and drainage design for car park and driveway areas. Avoiding existing tree protection zones required intricate design work. Proprietary treatment system used for treatment of carpark stormwater run-off prior to discharging to legal point of discharge.
Waverley Road, Glen Waverley
Project Type: Residential Apartment including 12 luxury apartments with 15 carpark spaces
4 Storey post tensioned concrete structure with single level basement
3M Structural Solution was engaged to provide structure and civil consultancy and design.
Riversdale Road, Hawthorn
Project Type: Residential Apartment including 18 luxury apartments with 20 carpark spaces
4 Storey post tensioned concrete structure with double level basement
3M Structural Solution is engaged to provide for structure, facade and civil consultancy and design.
Cape Street, Heidelberg
Project Type: Steel frame Residential Units including single level basement car park
Triple Storey steel and timber frame structure with single level basement
3M Structural Solution was engaged to provide for structure and civil consultancy and design.
Malvern Road, Malvern East
Project Type: Steel frame Residential Units including single level basement car park
Triple Storey steel and timber frame structure with single level basement
3M Structural Solution was engaged to provide structural and civil consultancy and design.
North Road, Ormond
Project Type: 18 Steel frame residential units including single level basement car park
Triple Storey steel and timber frame structure with single level basement
3M Structural Solution provided structural engineering and construction stage services.
Mont Albert Road, Camberwell
Project Type: Residential double storey concrete structure over single level basement with retention wall design and swimming pool design
3M Structural Solution provided structural engineering, civil engineering and construction stage services.
HUNTER STREET, GLEN WAVERLEY
Project Type: Residential apartment including 26 luxury apartments, basement level and carpark spaces
4 storey post tensioned concrete structure with single level basement
3M Structural Solution was engaged to provide structural consultancy and fit out design.
WELLINGTON STREET, KEW
WELLINGTON STREET, KEW
Project Type: Residential apartment including 12 luxury apartments basement level and carpark spaces
2 storey structure with single level basement
3M Structural Solution was engaged to provide structural consultancy and fit out design.
LUNA APARTMENTS
LUNA APARTMENTS
Project Type: 56 residential apartments
5 storey structure with double level basement, concrete design and construction and value management
3M Structural Solution was engaged to provide structural consultancy and fit out design.
Mont Albert Road, Camberwell
Project Type: Residential double storey concrete structure over single level basement with retention wall design and swimming pool design
3M Structural Solution provided structural engineering, civil engineering and construction stage services.
Grange Road, Toorak
Project Type: Residential double storey concrete structure over single level basement with retention wall design and swimming pool design
3M Structural Solution was engaged for structural engineering, civil engineering and facade design.
Mont Albert North Mansion
project type: Double storey dwelling with concrete waffle slab and Light Gauge Streel (LGS) framing
3m structural solution was engaged for structural engineering and construction inspection.
McRee Road, Vermont South
Project Type: 14 Triple Storey steel frame units, concrete raft slab foundation and retaining wall design
3M Structural Solution provided structural engineering, civil engineering and construction inspections.
Esdale Street, Doncaster
Project Type: Three double storey steel frame units, stiffened raft slab concrete footing and retaining wall design
3M Structural Solution provided for structural engineering, civil engineering and inspections.
Port Melbourne Townhouse
Project Type: 16x three and four storey unit development
structural design involved light guauge steel framing and bracing
PARRING ROAD, BALWYN
PARRING ROAD, BALWYN
Project Type:12 Residential townhouses on a single level communal basement carpark
2 storey structure with single level basement
3M Structural Solution was engaged to provide structural consultancy and fit out design.
Waverley Road, Glen Waverley
Project Type: Double storey post tensioned concrete Childcare structure with design for steel framed roof systems
3M Structural Solution provided structural engineering, civil engineering and value management consulting.
3m - saltlake
Salt Lake Boulevard, Wollert
Project Type: Single storey Childcare with significant Heritage protection overlay. Design with existing bluestone walls as part of heritage council requirements
3M Structural Solution provided structural engineering, civil engineering and value management consulting.
Dandenong Frankston Road, Dandenong Warehouse
Project Type: Structural design to steel frame portal beams, roof systems, retrofit and structural strengthening to existing steel columns
3M Structural Solution provided structural engineering and construction inspections.
PENTRIDGE RESTAURANT
PENTRIDGE RESTAURANT
Project Type: Commercial fit out and structural seismic design
3M Structural Solution was engaged to provide structural consultancy and fit out design.
DINGLEY PAVILLION
DINGLEY PAVILLION
Project Type: Commercial fit out and structural seismic design
3M Structural Solution was engaged to provide structural consultancy and fit out design.
GIPSLAND SPECIALIST SCHOOL
GIPPSLAND SPECIALIST SCHOOL
Project Type: School fit out and structural seismic design
3M Structural Solution was engaged to provide structural consultancy and fit out design.
CAPITAL GRAND
CAPITAL GRAND
Project Type: Commercial fit out and structural seismic design
3M Structural Solution was engaged to provide structural consultancy and fit out design.
Doncaster Road, Doncaster East
Project Type: 14 Units Residential Development
Ground floor drainage design including on-site detention system and in ground reuse rainwater tanks for reuse purpose. Site stormwater discharged was limited to pre-development flow rate using orifice/ baffle control pit prior to connection to legal point of discharge. Civil design included an 18m length outfall drain meeting the requirement of local council.
Grange Road, Toorak
Project Type: Residential double storey concrete structure over single level basement with retention wall design and swimming pool design
3M Structural Solution was engaged for structural engineering, civil engineering and facade design
High Street Road, Glen Waverly
Project Type: 4 Level Residential Apartment On 2 Level Basement
Civil design involved ground floor stormwater drainage design and 2 level basements. Oversized pipes were used for on-site detention. Multi-Cell flow control system was used to control the site discharge flow rate meeting council requirement. Basement pumps were designed for 100 years flood event. Extensive coordination with all design consultants including architectural, structural, services and fire engineering were required prior to submission of civil design plan to local council.
Kays Avenue, Hallam
Project Type: 18 Units Development
Internal stormwater drainage design on a 3682sqm site. Design involved on-site detention system using baffle wall pit system restricting site discharge to pre-development discharge rate to the satisfaction of local council.
Leura Street, Surry Hills
Project Type: Apartment Development Over Single Level Basement
Design involved internal drainage system design via an onsite detention system for 8 units over a single levels basement. Basement drainage was comprised of retention wall drainage, pump design and treatment system for basement retention wall system seepage.
Riversdale Road, Hawthorn
Project Type: 4 Level Apartment Over 2 Level Basement
Internal stormwater drainage design including on-site drainage system. 2 level basement drainage involved capturing seepage from
retention piles and conveying to pump system detentions system. The pump system was designed for 100-year storm event. On-site detention volume was accommodated in an underground detention  tank connecting to an orifice pit prior to connection to legal point of  discharge. Civil design required extensive and ongoing coordination  with all design consultants including architectural, structural, and  service engineers.
Saltlake Blvd, Wollert
Project Type: Childcare Center Including 17 Carpark Spaces
Stormwater drainage design on a 2238sqm site including onsite  detention system. Civil design included flexible pavement design  and drainage design for car park and driveway areas. Avoiding existing tree protection zones and existing heritage buildings onsite required intricate design work.
Waverley Road, Glen Waverley
Project Type: Two Level Childcare Center Including 32 Carpark Spaces
Stormwater drainage design across 3 lots including on-site detention system using oversized drainage pipes. Civil design included rigid pavement design and drainage design for car park and driveway areas. Avoiding existing tree protection zones required intricate design work. Proprietary treatment system used for treatment of carpark stormwater run-off prior to discharging to legal point of discharge.

Let's Keep in Touch

We'd love to hear from you! If you have any questions or want to discuss a project, please fill out the contact form below. Our team will review your message and reply as soon as possible. Thank you for reaching out to 3M Structural Solution.

All rights reserved for 3M Structural Solution | Design By  We Love Design | ⓒ Copyright 2024